Land slide and River Bank Protection works in Uttarakhand

Client : Excelling Geo & Engineering Consultant Pvt. Ltd., New Delhi
Location : Saknidhar & Dev Prayag Land Slide Protection Works at NH58 & River Bank Protection Works at Srinagar (Uttarakhand)
Scope of Work : Construction stage detailed engineering design of 3 No. Projects - Road Land slide sites and slope stabilization including 2 D Analysis on slope-W & Geo5 .
To provide cost effective solutions with the latest technologies to treat and handle the vulnerable / failed slopes. Slope safety review and reinforcement design
Project Description : Some of the project road locations are identified as critical spots from stability point of view by the Border Road Organization (BRO). BRO urged MoRTH to revisit these locations and suggested for adequate treatments / restorations works to ensure smooth running of Char-dham Yatra.
Status : Successfully Completed within the stipulated time. Protection work under progress

 

Khambataki Ghat & Kashedi Ghat Highway Road Twin Tunnels - Maharashtra (India)

Client : Gayatri Projects Pvt. Ltd. Hyderabad
Location : Two Nos. Khambataki Ghat ( 1.14 Km ) and Kashedi Ghat ( (1.72 Km) Highway Road Twin Tunnels in Maharashtra (India)
Scope of Work : Bid Stage Engineering Support of Two No. Projects - Khambataki Ghat ( 1.14 Km ) and Kashedi Ghat ( (1.72 Km) Highway Road Tunnels ( finished size 14.2m wide x 9.93m high, modified D shaped ) in Maharashtra State
Project Description : 1. Critical review of available data & drawings provided by the client
2. Design inputs for preparation of Inception Report
3. Finalization of tunnel geometry
4. Tunnel portal excavation & support system design & drawings
5. Tunnel lining design & drawings
6. Instrumentation
7. BOQ and cost estimation
8. Construction methodology and time schedule
9. Any other supporting design & drawings in connection with the tunnel design.
Status : Successfully Completed within the stipulated time.

RVNL- 3 No. Adit Tunnels for Broad Gauge Railway Line between Rishikesh to Karan Prayag (Uttarakhand)

Principal Client : Rail Vikas Nigam Limited, India
Client : Eptisa India Ltd. Kolkata
Location : Railway Line Tunnel between Rishikesh and Karanprayag - Uttarakhand
Scope of Work : Detailed Design Consultancy Services for RVNL, 3 No. Adit Tunnels & Portals (A1 – 307m Long, A2 – 573m Long And A3 – 942m Long, total 1822m ) to facilitate the Railway Line Tunnel between Rishikesh and Karanprayag - Uttarakhand
Project Description : Construction stage detailed engineering and numerical analysis related to adit tunnels & other associated works. The work will include review of available design reports & drawings, preparation of Basic design report, detailed engineering drawings & Design reports for Principal Client & Proof checker’s approval. The design shall be presented in such a way that the calculations are clear and easily understandable so as to allow the contractor or another design engineer in the construction stage to review, own and improve the designs during the implementation, if needed. All design & drawings should be fit for construction. Detailed work scope will include:

1. Review of available data & drawings provided by RVNL
2. Design inputs for preparation of Inception Report
3. Finalization of tunnel cross section
4. Adit tunnel portal excavation & support system design & drawings
5. Adit tunnel excavation & support system design & drawings
6. Tunnel lining design, numerical analysis & drawings
7. Main tunnel & adit tunnel junction design & drawings
8. Instrumentation
9. Any other supporting design & drawings in connection with the tunnel design.
Challenges : The geological conditions for Adit-3 was unfavorable for underground excavation in the Initial reach of about 150 - 200 m out of 942 m and materials consisting of mixture of sand, silty sand / sandy – silt (fine – coarse grained), and thin veneer of silty clay to clayey silt (clayey soil near the surface.), also accompanied by fractured, shattered rock mass material present to have heavy void ratio, which appears to highly permeable / more clayey layers and causing saturation & ground movements. In addition to above, the soil/rock mass in this reach of tunnel is under heavy tectonic stresses and seepage conditions and squeezing in nature.
Status : Design part has been completed Successfully within the stipulated time and construction is under progress

Sharp Hydroengineering Team have vast experience in the field of Road and Highway tunnels right from concept to commissioning

Consultancy in Preparation of Feasibility / DPR, Tender Stage and construction stage engineering design of Road and Highway Tunnels in the hilly terrain.
Our Team professionals are having individual experience in Roads and Highway tunnels for Designing of different level engineering. Some of the examples of road tunnel designing are given below:
The Site of the Project Highway comprises the section of National Highway 21 commencing from Km 73.200 to Km 186.500 i.e. the Kiratpur – Ner Chowk section in the State of Himachal Pradesh and Punjab./td>
As per Drawings received, Highway road tunnel system consists of the following tunnels:

• Khambataki Ghat & Kashedi Ghat Road Twin Tunnels in the State of Maharashtra
• RVNL – 3 No. Adit Tunnels to link the broad gauge Railway line in between Rishikesh to Karan Prayag in the state of Uttarakhand Chainage (Km) 12.73 – 14.48
• Escape tunnel (D Shape 7m dia and 1905 m long)
• Highway tunnel 2 (12 m wide, 8 m High and 650m long) Chainage (Km) 15.8 – 16.450
• Highway tunnel 3 (12 m wide, 8 m High and 400 m long ) Chainage (Km) 23.63 - 24
• Highway tunnel 4 (12 m wide, 8 m High and 1410 m long) Chainage (Km) 148.58 – 149.99
• Highway tunnel 5 (12 m wide, 8 m High and 860 m long)
Chainage (Km) 157.8 – 158.66 • Theng Tunnel in Sikkim near Chungthang
• Six Laning of Dhankuni-Kharagpur section NH-6 from Km 40.000 to Km 72.000 in the state of West Bengal
• Construction of Two No. Tunnels between Banihal-Srinagar NH-1a in the State of Jammu & Kashmir.